ADLER PROJECTS
PROJECT DELIVERY · SCOTLAND

Adler Projects Solutions Ltd · Aberdeen

Shelters, external works and renovations. Managed end to end.

We plan and deliver cycle and scooter storage, shelters, outdoor spaces, renovations and fit-outs for councils, schools, businesses and homeowners across Scotland. You get one accountable contact, vetted specialist installers and a safe, well-run site from survey to handover.

7000 ELEVATION A · COVERED CYCLE SHELTER 10 BERTH · SHEFFIELD STANDS
Illustrative models · not completed projects7 m covered shelter · 10 berth · dims in mm

01 · Services

What we deliver

We act as principal contractor or client-side project manager. Specialist manufacturers and installers do the fabrication and fitting, and we take responsibility for programme, safety, quality and handover.

Active travel

Cycle and scooter storage

Covered shelters, adult and junior cycle racks and scooter racks for schools, nurseries, workplaces and public spaces.

Structures

Shelters, canopies and fabrication

External shelters, canopies and bespoke steel or timber items made by vetted fabricators, including removal of old structures.

External works

Groundworks and surfacing

Bases, foundations, paths and levelling on sloped or constrained sites, coordinated with the main installation.

Outdoor spaces

Play and recreation areas

Refurbishment projects delivered with specialist play partners, with equipment and surfacing to recognised safety standards.

Homes

Home renovations

Kitchens, bathrooms, interiors and whole-home refurbishments, with every trade planned, coordinated and managed for you.

Commercial

Refurbishment and fit-out

Hospitality, office and retail refurbishments: plans, contractors, suppliers and stakeholders managed on one programme.

02 · How we work

From site survey to handover

Every project runs through the same six stages, so you always know what happens next and who is responsible.

  1. Survey and verify

    We visit each site with our installers to confirm footprints, levels, services, access and fixing surfaces before we price.

  2. Itemised quotation

    Priced per location, with supply, installation, groundworks and removals shown separately. Options and exclusions are stated clearly.

  3. Plan the works

    Construction phase plan, risk assessments and method statements, and a programme agreed with you and each site.

  4. Deliver safely

    Segregated work areas, controlled deliveries and timings that fit around school days and public use.

  5. Hand over

    Clean, usable sites with product information, maintenance guidance and written confirmation of completion.

  6. Aftercare

    A single point of contact for warranty and defects, so you never have to chase a subcontractor yourself.

03 · Compliance

Safe sites, clear paperwork

Much of our work takes place at schools and public spaces. These are the standards we work to on every project.

Regulations
Principal contractor duties under the Construction (Design and Management) Regulations 2015
Site safety
Site-specific risk assessments and method statements, issued before work starts
Safeguarding
Our project lead is a PVG scheme member. Operatives on school sites are PVG-checked or supervised at all times.
Subcontractors
Vetted for insurance, competence and accreditation before they are appointed

04 · Projects

Recent work

Hospitality fit-out · Aberdeen · 2026

Brasserie fit-out at a luxury Aberdeen hotel

The creation of a new brasserie at the heart of one of Aberdeen's best-known luxury hotels, opened in early 2026.

Gideon Okoli was the client-side project manager. He coordinated the internal and external project plan and managed the contractors and suppliers working alongside the main contractor through to opening.

05 · Who we are

Led by a project manager, not a salesperson

Adler Projects is led by Gideon Okoli, who has 16 years of experience in project management, business development and supplier management, including OEM liaison with manufacturers across Asia. He has worked as client-side project manager on a £10M programme and on a hotel brasserie fit-out in Aberdeen.

We keep our own team small and bring in the right specialists for each job. That keeps costs down, and you always deal with the person running your project.

  • MSc Project Management, Robert Gordon University
  • PRINCE2 Practitioner
  • Based in Aberdeen, working across Scotland

06 · Contact

Request a quotation

Send us your specification, site list or a short description of the work. We reply within two working days.

Emailprojects@adlerprojects.co.uk
Phone+44 7765 652730
OfficeAberdeen, Scotland
Areas coveredAberdeen and Aberdeenshire, the Lothians, the Central Belt and across Scotland